Pages

Showing posts with label Kitchen. Show all posts
Showing posts with label Kitchen. Show all posts

7/30/2012

Wall Mounts, Caulk & All The Trimmings!

I’m very excited to say that a great deal of progress has been made on our little built-in project in the family room since I last posted about it over a month ago.

Here’s a quick picture to remind you of what things looked like before we started the project

DSCN2268

…and a picture from my last built-in update.

DSCN2634

Well, here’s a picture of where we are with it now!

DSCN3244

So what all have we (and by “we” I actually mean “Craig”) done? 

Well, he added trim to the shelves (to cover the brown, unfinished edges),

DSCN2705

DSCN2715

…filled all of the cracks with caulk (and finished things off with his handy little finishing tool),… 

DSCN2824

DSCN2823

DSCN2801

…installed the wall mount and the electrical box for the TV,…

DSCN2846

DSCN2847

DSCN2852

…and added crown molding, baseboards and toe kick!

DSCN3246

DSCN3241

DSCN3244

What a HUGE difference these small changes have made! Can’t wait to finish the last few details (add shoe molding, touch up the paint, install cabinet hardware) and fill the shelves!

6/18/2012

Another Built-In Progress Report

I realize that it’s be a really long time since my last built-in desk/entertainment area update.  Please don’t think that the lack of posts on the subject is due to a lack of progress though.  Tremendous progress has definitely been made!  I’ve just been too slack busy to blog about it.  I apologize!

Anyway, here is a reminder of how things looked before we ever started this built-in project.

DSCN2268

And here’s a picture from when we last left off.

DSCN2426

And here’s how things look now!

DSCN2634

Still not complete, but definitely much further along than the picture from before.  So, what exactly have we (and by we I totally mean Craig) been up to?

Well… first Craig installed electrical outlets, cable jacks, and internet jacks in the back of the entertainment and desk cabinets.  Thankfully, we knew when we renovated and rewired the kitchen/family room that we planned to later install built-ins, so we made sure to run the necessary wires in the walls before our new drywall went up.  Honestly, I don’t know how he does it, but Craig really makes this kind of stuff look easy!  After cutting a rather large hole in the drywall behind the cabinets, he simply fished out the wires, marked and cut holes in the backs of the cabinets, and installed the electrical boxes.  Then he slid the cabinets back into place and secured them. 

DSCN2478

DSCN2482

DSCN2480

After all of the electrical work was done, it was time to start planning for the shelves.  We discussed a few different layouts for the shelves before we finally settled on our final design.  Then Craig got to work installing the supports that would hold the shelves. 

DSCN2463

DSCN2465

DSCN2473

DSCN2505

Once all of the supports were installed over both the desk and entertainment area, his focus turned to building the shelves and countertops.  We decided to use MDF as the main material for this part of the project.  Craig built the shelves by taking two pieces of MDF and sandwiching a piece of wood that had been cut down to size in between.  He made sure to leave a gap on the sides and back to allow for the shelves to slide back onto the supports he had secured to the walls.  The countertops he made by securing two pieces of MDF together and then trimming out the front edge.

DSCN2471

DSCN2469

When the shelves and countertops were all built it was then time to begin painting.  After doing a little research we chose to use an alkyd paint to help the shelves and countertops hold up better over time.  Craig applied a nice, solid coat of Sherwin William’s Multi Purpose Latex Primer which he then followed with a few coats of Sherwin William’s Pro Classic Waterbased Acrylic-Alkyd in extra white.  To help eliminate brush/roller marks he added a little Floetrol Latex Paint Additive to the paint.  This also helped to extend the dry time of the paint, which was a huge help since alkyd paint tends to dry so quickly.

DSCN2613

After everything was painted and dried it was time for the fun part… assembly!  Craig very carefully secured the countertops in place and then slid in all of the shelves.  I guess all of his planning paid off because all of the pieces fit together perfectly, just like a jigsaw puzzle!  It really was a beautiful thing! 

DSCN2621

DSCN2624

DSCN2618

DSCN2626

DSCN2637

DSCN2634

Now all that’s left to do is caulk the cracks where the brick meets the shelves and countertops, add all of the trim (including crown, baseboards, and toe kick), and accessorize the shelves.  Can’t wait for it all to be done! 

5/08/2012

Built-In Progress Report

We’ve got paint (for an added pop on the back of the built-ins)

DSCN2361

…and we’ve got cabinets!

DSCN2367

DSCN2371

DSCN2428

Now we just have to decide on a material for the counter tops, build shelves, add the trim, and so on…

DSCN2429

But even though we’re still far from finished, if you use a little imagination you can almost see it…

DSCN2426

…a completed built-in desk and built-in book case/entertainment area, that is!

Can you see it?  I know we can!  And we’re getting pretty darned excited to get it all done… hopefully before our new little guy arrives!

1/31/2012

DIY Roman Shades

Craig and I decided to try our hands at making some Roman shades out of vinyl mini blinds for our kitchen/family room.  I had read a couple of tutorials that made the project seem to be pretty simple (here and here).  Unfortunately, the project turned out to be anything but simple for us thanks to a few different problems.

  1. The pattern on the fabric we chose is not perfectly straight (which we didn’t realize until we had completed one shade and realized it was completely crooked when we went to mount it to the wall).
  2. The widths of the windows plus the trim are odd sizes (so we couldn’t find vinyl mini blinds in the correct size).
  3. Our windows are installed flush with the drywall, which means that there are no window frames to mount the shades inside of. 

So here’s what we did.

After one terribly crooked attempt, I decided to leave the fabric measuring, squaring, and cutting up to my engineer husband.  He was so frustrated after our first attempt ended up crooked that he was determined to fix it and figure out how to make it work for the rest of them.  So I just stepped back and left him to do his thing.

DSCN1991

DSCN1994

DSCN1989

While Craig was engineering the heck out of the fabric I was busy in the other room disassembling the vinyl mini blinds. 

DSCN1982

After laying the blinds out on the floor I cut and removed the lateral strings that turn the slats.  I was extra careful not to cut the thick lift cord that goes through the middle of each slat. 

DSCN1983

Then I removed the bottom bar and slid off the majority of the vinyl slats.  I left 4 slats for the shade to be used over the sink and 5 slats for all of the other shades.

DSCN1984

DSCN1987

Once all of the fabric was measured, cut and hemmed we laid the vinyl blinds out on the fabric and marked where we needed to glue each slat.  We decided to glue a slat every 10 inches. (Notice how the bar doesn’t go all the way to the edge of our fabric?  That’s thanks to problem #2 listed above.  I’ll talk about how we addressed that in a minute.)

DSCN2005

DSCN2014

After making all of our marks we began gluing the top and bottom bars and slats in place using fabric glue.  We placed the glue on the convex side of the vinyl slats

DSCN2008

DSCN2011

Once all of the slats were glued in place we cut several of the leftover slats into 6 inch pieces.  We then glued these pieces to the ends of the existing slats and bars which basically extended their widths that they ran all the way to the edge of the fabric.

DSCN2035

DSCN2034

Then after letting the glue set for a while Craig mounted the shades to the wall 6 inches higher than the window trim (to create the illusion of taller windows)

DSCN2016

DSCN2018

DSCN2022

DSCN2021

All in all, I think the finished products turned out great!  What do you think?